Trucking Road Expansion Project
In 2018 MSC successfully completed the expansion of the trucking roadway at the Hexion, Inc. The facility remained fully operational during the duration of the project with minimal disruption. MSC worked closely with Hexion engineers and staff to ensure the project was completed on schedule with zero down time to their facility.


- Removal and excavation of existing pavement and spoils
- Excavation of slope bank on existing ditch
- Installation of Filter Fabric
- Installation of 3” Rip rap
- Installation of 250 LF of PZ-22 sheet piling along existing ditch
- Installation of drainage piping.
- Installation of 300 LF of guardrail
- Installation of 140 Yards of reinforced concrete.



Related Projects
Corey Steel Company
Metro Suburban Construction has assisted Corey Steel Company with general maintenance on their facility since 2010.
71st Street Culver Bridge Replacement
In 2014 MSC completed the replacement of the 71st Street industrial park entrance culvert bridge. This project included excavation and removal of damaged existing culvert, which caused water back up into the industrial park.
Weldstar Purity
In 2019 MSC worked with Weldstar Company to help assist with their newly added specialty gas laboratory at the University Park Location.